Rova Motion

HepcoMotion PRT2 vs. Rova RM-RT351: 1:1 Oval Ring Track Mounting, Lead Time & Cost Comparison

AUTHOR: Lead Ring Track Systems Engineer · UPDATED: 2026-11-24 · 7 MIN READ · Verified by Rova Motion Engineering

Why OEM Machine Builders Evaluate 1:1 Ring Track Alternatives

Precision oval ring track conveyors are the backbone of high-speed rotary assembly machines in EV lithium battery, 3C electronics, and medical IVD automation. However, 10–14 week lead times and escalating unit costs from European tier-1 suppliers frequently stall prototype builds and machine delivery schedules.

The Rova RM-RT351 was engineered from the ground up as a 1:1 mechanical drop-in replacement for the HepcoMotion PRT2 / DTS2 Ø351 mm oval loop architecture—preserving identical baseplate bolt patterns, V-guide profile geometry, and carriage datum heights.

Mechanical & Dimensional Compatibility Matrix

Every RM-RT351 straight rail and 180° Ø351 mm arc segment is induction-hardened to HRC 60–62 and profile-ground in a single CNC clamping setup. This eliminates transition steps where carriages move from straight rails into curved arcs at 2,500 mm/s.

  • Arc Pitch Diameter: Ø351 mm (exact 1:1 match for standard PRT2-351 loops)
  • Station Repeatability: ±0.02 mm with secondary pneumatic taper-pin locking
  • Carriage Load Capacity: Up to 25 kg per bogie carriage, supporting 6 to 24 carriages per loop
  • Lead Time: 10–12 days standard dispatch with full Factory Acceptance Test (FAT) video

Servo Motor & Gearbox Drop-In Integration

Machine builders can specify zero-NRE custom drive flanges for Mitsubishi, Panasonic, Yaskawa, or Siemens 750W–1kW servo motors paired with 5:1 or 10:1 precision planetary reducers. Native .STEP assemblies are delivered within 4 business hours for collision verification inside SolidWorks or Inventor.

Engineering FAQs

Does RM-RT351 require redesigning our existing PRT2 aluminum machine frame?

No. Base mounting hole pitches, rail datum height, and carriage mounting patterns match 1:1 with standard Ø351 mm PRT2 / DTS2 layouts.

What is the minimum order quantity (MOQ) for prototype validation?

MOQ is 1 complete oval track assembly, dispatched in 10–12 days with a Renishaw / CMM inspection certificate and FAT run-off video.

FREE 1:1 ENGINEERING CROSS-CHECK

Need a 3D .STEP Comparison for Your Machine?

Send your competitor part code or CAD assembly for a verified drop-in quote within 4 business hours.

Request Engineering Quote